Combined Work Rate: Two Printers
The OfficeJet printer can copy Sue's dissertation in 10 minutes. The LaserJet printer can copy it in 16 minutes. If both machines work together, how long would they take to copy the dissertation?
What You Will Learn
- Converting completion times into work rates (jobs per minute)
- Adding work rates to find combined productivity
- Using the reciprocal relationship between rate and time
- Working with fractions in practical applications
- Understanding why you can't simply average completion times
Solution: Method 1 — The Combined Rate Approach
The key insight is that when machines work together, we add their work rates, not their completion times. Let's convert each machine's performance into a rate.
Step 1 — Convert completion times to work rates
Work rate tells us what fraction of the job gets completed per minute:
LaserJet rate = 1/16 dissertation per minute
Step 2 — Add the individual rates
When working together, their rates combine:
Step 3 — Find a common denominator
To add these fractions, we need a common denominator. The LCM of 10 and 16 is 80:
1/16 = 5/80
Combined rate = 8/80 + 5/80 = 13/80 dissertations per minute
Step 4 — Convert the rate back to time
To find how long it takes to complete 1 dissertation, we take the reciprocal:
Converting to minutes and seconds: 80/13 = 6 + 2/13 ≈ 6 minutes and 9 seconds
Solution: Method 2 — Work Completed Per Minute (Tabular)
Sometimes it helps to visualize exactly how much work each printer completes each minute. Let's track their progress in a table.
Step 1 — Calculate work completed per minute
Express each printer's contribution as a fraction of the whole job:
LaserJet: 1/16 of dissertation per minute
Combined: 1/10 + 1/16 = 13/80 per minute
Step 2 — Track cumulative progress
Let's see how much of the dissertation is completed after each minute:
| Time (minutes) | Work Done This Minute | Total Progress |
|---|---|---|
| 1 | 13/80 | 13/80 = 16.25% |
| 2 | 13/80 | 26/80 = 32.5% |
| 6 | 13/80 | 78/80 = 97.5% |
| 80/13 ≈ 6.15 | Remaining fraction | 80/80 = 100% |
Step 3 — Solve for exact completion time
We need to find when the total work equals exactly 1 dissertation:
t = 80/13 ≈ 6.15 minutes
Verification
Let's verify our answer by checking that the combined work in 80/13 minutes equals exactly one complete dissertation.
Check each printer's contribution
LaserJet work = (1/16) × (80/13) = 80/208 = 5/13 dissertations
Verify the total
Double-check with decimals
OfficeJet: 6.154/10 = 0.615 dissertations
LaserJet: 6.154/16 = 0.385 dissertations
Total: 0.615 + 0.385 = 1.000 ✓
Does This Seem Reasonable?
Let's step back and see if our answer makes intuitive sense.
The OfficeJet alone takes 10 minutes, and the LaserJet alone takes 16 minutes. When working together, they should definitely finish faster than either machine working alone.
What if both printers were equally fast? If both took 10 minutes alone, together they'd take 5 minutes (half the time). Since the LaserJet is slower than the OfficeJet, we'd expect the combined time to be slightly more than 5 minutes. Our answer of 6.15 minutes fits this expectation.
The tempting but wrong approach would be to average the times: (10 + 16)/2 = 13 minutes. This is clearly wrong because two machines working together should be faster than either one alone, not slower than both!
Watch Out For These
Wrong: (10 + 16)/2 = 13 minutes
This is the most common error. Averaging suggests that two machines somehow work slower together than either works alone, which makes no physical sense. The mistake is treating time as additive when it's actually rates that add.
Wrong: 10 + 16 = 26 minutes
This error stems from confusing "working together" with "working in sequence." When machines work simultaneously, their productivities combine—they don't take turns.
Wrong: Rate = 10/1 + 16/1, so time = 1/(10 + 16)
This flips the fraction incorrectly. The rate of a machine that takes 10 minutes is 1/10 jobs per minute, not 10/1 jobs per minute. A machine that completes one job in 10 minutes is working slowly, not quickly.
Wrong: 1/10 + 1/16 = 2/26 = 1/13
You can't add fractions by adding numerators and denominators separately. Always find a common denominator first: 1/10 + 1/16 = 8/80 + 5/80 = 13/80.
The General Formula
For any two-machine work problem, there's a reliable pattern you can memorize.
then working together they take time: ab/(a + b)
Applying the formula to our problem
Combined time = (10 × 16)/(10 + 16) = 160/26 = 80/13 ≈ 6.15 minutes
Why this formula works
The formula comes directly from adding rates:
Combined time = 1/[(b + a)/(ab)] = ab/(a + b)
Real Applications
This type of rate-combination calculation appears frequently in real work scenarios:
Network downloads: When downloading a file simultaneously from multiple servers, your total download rate is the sum of the individual connection rates. A 100MB file downloading at 2MB/s from one server and 3MB/s from another will complete in 100/5 = 20 seconds.
Manufacturing and assembly lines: When multiple production lines make the same product, plant managers use this math to calculate total output capacity and plan delivery schedules.
Medical drug clearance: In pharmacology, when the body eliminates a drug through multiple pathways (kidney and liver), the total clearance rate is the sum of the individual clearance rates—the same mathematical structure as our printer problem.
What If?
Combined rate of first two printers: 1/10 + 1/16 = 13/80 per minute
Work completed: 2 × 13/80 = 26/80 = 13/40 of the dissertation
Work left to do: 1 - 13/40 = 27/40 of the dissertation
Third printer rate: 1/30 per minute
All three together: 1/10 + 1/16 + 1/30 = 24/240 + 15/240 + 8/240 = 47/240 per minute
Time needed: (27/40) ÷ (47/240) = (27/40) × (240/47) = 6480/1880 = 162/47 ≈ 3.45 minutes
Total time = 2 + 162/47 = (94 + 162)/47 = 256/47 ≈ 5.45 minutes
Check: First 2 minutes gives 13/40, next 162/47 minutes with all three gives (47/240) × (162/47) = 162/240 = 27/40. Total: 13/40 + 27/40 = 1 ✓
Answer: 5.45 minutes (5 minutes 27 seconds)
Let x = time for second printer alone
Combined rate: 1/6 per minute
Individual rates: 1/10 + 1/x = 1/6
1/x = 1/6 - 1/101/x = 10/60 - 6/60 = 4/60 = 1/15
Therefore x = 15 minutes
Check: 1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6 ✓
Combined time = 6 minutes ✓
Answer: 15 minutes
Combined rate: 1/10 + 1/16 = 8/80 + 5/80 = 13/80 per minute
Work completed: 3 × 13/80 = 39/80 of the dissertation
Work left: 1 - 39/80 = 80/80 - 39/80 = 41/80 of the dissertation
OfficeJet rate: 1/10 per minute
Time needed: (41/80) ÷ (1/10) = (41/80) × 10 = 410/80 = 41/8 = 5.125 minutes
Total work: 39/80 + (41/8 × 1/10) = 39/80 + 41/80 = 80/80 = 1 ✓
Answer: 5.125 minutes (5 minutes 7 seconds)
OfficeJet alone: 2 × 10 = 20 minutes
LaserJet alone: 2 × 16 = 32 minutes
OfficeJet rate: 1/20 double-dissertations per minute
LaserJet rate: 1/32 double-dissertations per minute
1/20 + 1/32 = 8/160 + 5/160 = 13/160 double-dissertations per minute
Time = 1 ÷ (13/160) = 160/13 ≈ 12.31 minutes
Notice: This is exactly double our original answer of 80/13 minutes.
Double work at same rates = double time: 2 × (80/13) = 160/13
OfficeJet work: (1/20) × (160/13) = 8/13
LaserJet work: (1/32) × (160/13) = 5/13
Total: 8/13 + 5/13 = 13/13 = 1 double-dissertation ✓
Answer: 160/13 ≈ 12.31 minutes (12 minutes 18 seconds)
Frequently Asked Questions
Add the individual work rates to get the combined rate, then take the reciprocal to find the time. If one machine completes a job in 10 minutes and another in 16 minutes, their rates are 1/10 and 1/16 jobs per minute. Combined rate = 1/10 + 1/16 = 13/80 jobs per minute, so time = 80/13 ≈ 6.15 minutes.
Work rate is how much of a job gets done per unit time (jobs per minute), while work time is how long it takes to complete one whole job. They are reciprocals: if a printer takes 10 minutes for one job, its rate is 1/10 jobs per minute. In this problem, we add rates but cannot add times directly.
Averaging times gives the wrong answer because work doesn't scale linearly with time when machines work together. The average of 10 and 16 minutes is 13 minutes, but two machines working together will always finish faster than either machine alone. The correct approach is to add the work rates, which properly accounts for the combined productivity.