Work Rate Problem: Kendall and Dale Cleaning Together

Work Rate 9th-10th Grade
PROBLEM
Kendall can clean the garage in 6 hours; Dale can do it in 9 hours. If they work together, how long will it take?

What You Will Learn

  • How to convert individual completion times into work rates (jobs per hour)
  • Why work rates add when people work together, but completion times don't
  • The relationship between rate and time: Time = Work ÷ Rate
  • How to add fractions with different denominators in a practical context
  • Recognition of the classic work rate problem structure that appears across mathematics

Solution: Method 1 — The Rate Addition Approach

The key insight is that when people work together, their rates add up, not their times. Let's think about how much of the job each person completes per hour.

Step 1 — Find each person's work rate

Kendall completes 1 garage in 6 hours, so his rate is 1/6 garage per hour.

Dale completes 1 garage in 9 hours, so his rate is 1/9 garage per hour.

Step 2 — Add their rates to find the combined rate

When working together, their combined rate is:

Combined rate = 1/6 + 1/9

To add these fractions, we need a common denominator. The LCD of 6 and 9 is 18:

1/6 = 3/18 and 1/9 = 2/18

So: 1/6 + 1/9 = 3/18 + 2/18 = 5/18 garage per hour

Step 3 — Calculate the time to complete one garage

Using the formula Time = Work ÷ Rate:

Time = 1 garage ÷ (5/18 garage per hour) = 1 × 18/5 = 18/5 hours

18/5 = 3.6 hours

Step 4 — Convert to hours and minutes

The decimal part: 0.6 hours × 60 minutes/hour = 36 minutes

So 3.6 hours = 3 hours and 36 minutes

Solution: Method 2 — The Shortcut Formula

There's a neat formula for two-worker problems that comes from the algebra we just did. For two people with individual times a and b, their combined time is:

T = (a × b) ÷ (a + b)

Step 1 — Apply the formula

Here, a = 6 hours and b = 9 hours:

T = (6 × 9) ÷ (6 + 9) = 54 ÷ 15 = 18/5 = 3.6 hours

Step 2 — Where does this formula come from?

The combined rate is 1/a + 1/b = (b + a)/(ab)

The time is the reciprocal of the rate: Time = 1 ÷ [(a + b)/(ab)] = ab/(a + b)

This confirms our answer and gives us a handy shortcut for future problems.

Answer: Working together, Kendall and Dale will clean the garage in 3.6 hours, or 3 hours and 36 minutes.

Verification

Let's check our answer by seeing how much work gets done in 3.6 hours:

Kendall's contribution: 3.6 hours × (1/6 garage per hour) = 3.6/6 = 0.6 garage

Dale's contribution: 3.6 hours × (1/9 garage per hour) = 3.6/9 = 0.4 garage

Total work: 0.6 + 0.4 = 1.0 garage ✓

Perfect! The fractions add up to exactly one complete garage.

Common Pitfalls

✗ Mistake 1: Averaging the times
(6 + 9) ÷ 2 = 7.5 hours
This is wrong because it suggests that working together takes longer than either person working alone, which makes no sense. Times don't add when people work together — rates do.
✗ Mistake 2: Adding the times directly
6 + 9 = 15 hours
This would mean working together takes longer than both people working sequentially, which is backwards. Collaboration should speed things up, not slow them down.
✗ Mistake 3: Using the faster person's time
"Since Kendall is faster, it takes 6 hours"
This ignores Dale's contribution entirely. Even though Dale is slower, he still adds meaningful work that reduces the total time below 6 hours.

The Pattern Behind This

Work rate problems follow a consistent pattern that appears throughout mathematics:

Individual Rate = 1 ÷ (Individual Time)
Combined Rate = Sum of Individual Rates
Combined Time = 1 ÷ (Combined Rate)

For n workers with times t₁, t₂, ..., tₙ, the combined time is:

T = 1 ÷ (1/t₁ + 1/t₂ + ... + 1/tₙ)

This is the harmonic mean of the individual times. Notice how it's always less than the arithmetic mean (simple average) and always less than the fastest individual time — which is exactly what we expect when people collaborate.

Real Applications

Network Computing: When multiple processors work on the same computational task, their processing rates add up just like work rates. A 2 GHz processor and a 3 GHz processor together don't average to 2.5 GHz — they provide 5 GHz of combined processing power.

Manufacturing: Production lines with multiple workers or machines follow the same mathematics. If Machine A produces 100 units per hour and Machine B produces 150 units per hour, together they produce 250 units per hour, not some average.

Medical Clearance: Drug clearance from the body involves multiple pathways (kidney, liver, etc.) that work in parallel. The total clearance rate is the sum of the individual pathway rates.

What If?

1
Faster Workers
Kendall can clean the garage in 4 hours; Dale can do it in 6 hours. If they work together, how long will it take?
Step 1 — Find work rates

Kendall's rate: 1/4 garage per hour
Dale's rate: 1/6 garage per hour

Step 2 — Add the rates

1/4 + 1/6 = 3/12 + 2/12 = 5/12 garage per hour

Step 3 — Calculate time

Time = 1 ÷ (5/12) = 12/5 = 2.4 hours

Step 4 — Convert to hours and minutes

0.4 × 60 = 24 minutes
Answer: 2 hours 24 minutes

2
Partial Work Together
Kendall and Dale work together for 2 hours, then Kendall leaves. How much longer will Dale need to finish the garage alone?
Step 1 — Find combined work in 2 hours

Combined rate: 1/6 + 1/9 = 5/18 garage per hour
Work done: 2 × (5/18) = 10/18 = 5/9 garage

Step 2 — Find remaining work

Remaining: 1 - 5/9 = 4/9 garage

Step 3 — Dale's time for remaining work

Dale's rate: 1/9 garage per hour
Time: (4/9) ÷ (1/9) = 4 hours

Verification

Total work: 5/9 + 4/9 = 9/9 = 1 garage ✓
Answer: Dale needs 4 more hours

3
Three Workers
Kendall (6 hours), Dale (9 hours), and Pat (12 hours) all work together. How long will it take to clean the garage?
Step 1 — Find all three rates

Kendall: 1/6 per hour
Dale: 1/9 per hour
Pat: 1/12 per hour

Step 2 — Add all three rates

Common denominator = 36
1/6 = 6/36, 1/9 = 4/36, 1/12 = 3/36
Combined: 6/36 + 4/36 + 3/36 = 13/36

Step 3 — Calculate time

Time = 1 ÷ (13/36) = 36/13 ≈ 2.77 hours

Step 4 — Convert to hours and minutes

0.77 × 60 ≈ 46 minutes
Answer: About 2 hours 46 minutes

4
Reverse Problem
Kendall can clean the garage in 6 hours. Working together, Kendall and Dale finish in 3.6 hours. How long would Dale take working alone?
Step 1 — Find the combined rate

They finish in 3.6 hours = 18/5 hours
Combined rate: 1 ÷ (18/5) = 5/18 garage per hour

Step 2 — Use Kendall's known rate

Kendall's rate: 1/6 garage per hour
Dale's rate: 5/18 - 1/6

Step 3 — Calculate Dale's rate

1/6 = 3/18
5/18 - 3/18 = 2/18 = 1/9 garage per hour

Step 4 — Find Dale's time alone

Time = 1 ÷ (1/9) = 9 hours
Answer: Dale takes 9 hours alone

Frequently Asked Questions

Add their individual work rates (not their times). If Kendall works at 1/6 garage per hour and Dale at 1/9 garage per hour, their combined rate is 1/6 + 1/9 = 5/18 garage per hour. The time to finish is 1 ÷ (5/18) = 3.6 hours.
Averaging times gives the wrong answer because work rates add, not times. In this example, averaging would give (6 + 9) ÷ 2 = 7.5 hours, which is longer than either person working alone - clearly impossible. The correct answer is 3.6 hours using rate addition.
For two workers with times a and b, the combined time is T = (a × b) ÷ (a + b). Here: T = (6 × 9) ÷ (6 + 9) = 54 ÷ 15 = 3.6 hours. This formula comes from adding the reciprocals 1/a + 1/b and taking the reciprocal of that sum.
NJ
Neven Jurkovic, PhD

Professor of Computer Science, Palo Alto College, Alamo Colleges District, San Antonio, TX

Developer of Algebrator

Contact

This solution was prepared with AI assistance and reviewed by Dr. Jurkovic for mathematical accuracy and pedagogical clarity.

2026-11-02